Why a useful quote starts with a brief
A container project cannot be assessed responsibly from the product type alone. Intended use, layout, fittings, destination and site access all influence the final scope.
The main cost drivers
- •Number and size of modules
- •Interior and technical configuration
- •Facade and glazing options
- •Destination, access and placement conditions
- •Project-specific documentation and scope
What a clear offer should contain
The offer should list the selected configuration, assumptions, exclusions, transport and placement scope if requested, confirmed price and schedule.
Send your intended use, destination and key requirements for an individual project brief.
How long does realisation take?+
Realisation starts from a minimum of 6 weeks after order confirmation. The exact schedule is confirmed in the individual offer.
Is transport included?+
Transport and placement are included only when explicitly confirmed and priced in the individual offer.
Do I need a permit?+
Requirements depend on the location and intended use. Confirm them with the relevant local authority before ordering.