There is no universal permit answer
Requirements vary by country, municipality, intended use, size, placement period and connection to utilities.
Questions for the local authority
- •Is the intended use allowed on the site?
- •Which application or notification is required?
- •Which drawings and technical documents are required?
- •Which site, utility and fire-safety rules apply?
- •Can the project be ordered before approval?
Confirm responsibilities in the offer
Agree which project documents are included in the container offer and which must be prepared locally by the customer or appointed specialists.
How long does realisation take?+
Realisation starts from a minimum of 6 weeks after order confirmation. The exact schedule is confirmed in the individual offer.
Is transport included?+
Transport and placement are included only when explicitly confirmed and priced in the individual offer.
Do I need a permit?+
Requirements depend on the location and intended use. Confirm them with the relevant local authority before ordering.